Pages that link to "Item:Q973463"
From MaRDI portal
The following pages link to A scheduling problem with unrelated parallel machines and sequence dependent setups (Q973463):
Displaying 18 items.
- ABC-based manufacturing scheduling for unrelated parallel machines with machine-dependent and job sequence-dependent setup times (Q337126) (← links)
- Exact algorithms for a scheduling problem with unrelated parallel machines and sequence and machine-dependent setup times (Q941547) (← links)
- Capacitated lot sizing and sequence dependent setup scheduling: An iterative approach for integration (Q983631) (← links)
- A non-delayed relax-and-cut algorithm for scheduling problems with parallel machines, due dates and sequence-dependent setup times (Q1046712) (← links)
- A mathematical model and heuristic algorithms for an unrelated parallel machine scheduling problem with sequence-dependent setup times, machine eligibility restrictions and a common server (Q1634053) (← links)
- A hybrid multi-objective evolutionary algorithm approach for handling sequence- and machine-dependent set-up times in unrelated parallel machine scheduling problem (Q1692274) (← links)
- Scheduling rules to minimize total tardiness in a parallel machine problem with setup and calendar constraints (Q1762106) (← links)
- Scheduling unrelated parallel machines with optional machines and jobs selection (Q1762164) (← links)
- Bi-objective unrelated parallel machines scheduling problem with worker allocation and sequence dependent setup times considering machine eligibility and precedence constraints (Q2083384) (← links)
- An efficient network-based formulation for sequence dependent setup scheduling on parallel identical machines (Q2256404) (← links)
- An application of unrelated parallel machine scheduling with sequence-dependent setups at Vestel Electronics (Q2273664) (← links)
- Unrelated parallel-machine scheduling with deteriorating maintenance activities to minimize the total completion time (Q2439496) (← links)
- Unrelated parallel-machine scheduling with position-dependent deteriorating jobs and resource-dependent processing time (Q2448135) (← links)
- The distributionally robust machine scheduling problem with job selection and sequence-dependent setup times (Q2664350) (← links)
- Unrelated parallel machine scheduling with new criteria: complexity and models (Q2668730) (← links)
- A robust optimization approach for the unrelated parallel machine scheduling problem (Q2701168) (← links)
- Scheduling Unrelated Parallel Machines with Sequence Dependent Setup Times and Weighted Earliness–Tardiness Minimization (Q2958668) (← links)
- Bi‐criteria formulation for green scheduling with unrelated parallel machines with sequence‐dependent setup times (Q6070133) (← links)