Pages that link to "Item:Q975990"
From MaRDI portal
The following pages link to Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times (Q975990):
Displaying 11 items.
- A stochastic programming model for multi-product oriented multi-channel component replenishment (Q337560) (← links)
- Bi-objective optimization of a multi-product multi-period three-echelon supply chain problem under uncertain environments: NSGA-II and NRGA (Q508948) (← links)
- A multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms (Q869182) (← links)
- Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times (Q975990) (← links)
- Diversity of payment contracts in a decentralized assembly system (Q1699191) (← links)
- Multilevel production systems with dependent demand with uncertainty of lead times (Q1793230) (← links)
- A multi-objective lead time control problem in multistage assembly systems using an interactive method (Q2495993) (← links)
- Optimizing delivery lead time/inventory placement in a two-stage production/distribution system (Q2503238) (← links)
- Markovian queue optimisation analysis with an unreliable server subject to working breakdowns and impatient customers (Q2792956) (← links)
- Robust design of (<i>s</i>,<i>S</i>) inventory policy parameters in supply chains with demand and lead time uncertainties (Q2792965) (← links)
- Stochastic multi-objective optimization: a survey on non-scalarizing methods (Q5963107) (← links)