Pages that link to "Item:Q988479"
From MaRDI portal
The following pages link to An algebraic approach for determining the optimal lot size for EPQ model with rework process (Q988479):
Displaying 10 items.
- Economic lot scheduling with deliberated and controlled coproduction (Q439695) (← links)
- The derivation of EOQ/EPQ inventory models with two backorders costs using analytic geometry and algebra (Q554723) (← links)
- Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns (Q869601) (← links)
- Mathematical method for expediting scrap-or-rework decision making in EPQ model with failure in repair (Q1011913) (← links)
- A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering (Q1708531) (← links)
- A note on optimal replenishment policy for imperfect quality EMQ model with rework and backlogging (Q2389466) (← links)
- Production lot size problem with failure in repair and backlogging derived without derivatives (Q2470118) (← links)
- Solving production lot size problem with an improved delivery policy and failure in rework by a simplifi ed solution procedure (Q2903240) (← links)
- Using algebraic approach to solve an EPQ model with rework and service level constraint (Q3602258) (← links)
- A two-phase approach for jointly determining the lot size and delivery policy in a vendor-buyer integrated system with rework (Q5891690) (← links)