Pages that link to "Item:Q988776"
From MaRDI portal
The following pages link to Minimizing total flow time on a single flexible machine (Q988776):
Displaying 13 items.
- Scheduling with tool changes to minimize total completion time: Basic results and SPT performance (Q703937) (← links)
- The modular tool switching problem (Q726230) (← links)
- The tool switching problem revisited (Q881565) (← links)
- Minimizing the number of switch instances on a flexible machine in polynomial time (Q1785367) (← links)
- A matheuristic for parallel machine scheduling with tool replacements (Q2030722) (← links)
- The tool transporter movements problem in flexible manufacturing systems (Q3498887) (← links)
- Models Arising from a Flexible Manufacturing Machine, Part I: Minimization of the Number of Tool Switches (Q3818112) (← links)
- Models Arising from a Flexible Manufacturing Machine, Part II: Minimization of the Number of Switching Instants (Q3818113) (← links)
- (Q4952621) (← links)
- Minimizing flow time in a flow-line manufacturing cell with family setup times (Q5200787) (← links)
- (Q5501278) (← links)
- Unsupervised parallel machines scheduling with tool switches (Q6068687) (← links)
- Exploiting symmetry for the job sequencing and tool switching problem (Q6565440) (← links)