Pages that link to "Item:Q990778"
From MaRDI portal
The following pages link to Remarks on the optimization process of a manufacturing system with stochastic breakdown and rework (Q990778):
Displaying 8 items.
- The algorithm to locate the optimal solution for production system subject to random machine breakdown and failure in rework for supply chain management (Q378288) (← links)
- Notes on the mathematical modeling approach used to determine the replenishment policy for the EMQ model with rework and multiple shipments (Q712650) (← links)
- A note on ``Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns'' (Q1037696) (← links)
- Remarks on the optimization method of a manufacturing system with stochastic breakdown and rework process in supply chain management (Q1630159) (← links)
- The complete solution procedure for the EOQ and EPQ inventory models with linear and fixed backorder costs (Q1933909) (← links)
- Joint determination of optimal safety stocks and production policy for an imperfect production system (Q2428922) (← links)
- An optimization problem of manufacturing systems with stochastic machine breakdown and rework process (Q3552623) (← links)
- Product recovery in stochastic remanufacturing systems with multiple reuse options (Q5943563) (← links)