Pages that link to "Item:Q991876"
From MaRDI portal
The following pages link to Optimal reliability, production lot size and safety stock in an imperfect production system (Q991876):
Displaying 22 items.
- An integrated inventory model with variable lead time, defective units and delay in payments (Q275071) (← links)
- Product inspection policy for an imperfect production system with inspection errors and warranty cost (Q320671) (← links)
- An inventory model with reliability in an imperfect production process (Q426493) (← links)
- An EOQ model with delay in payments and stock dependent demand in the presence of imperfect production (Q440708) (← links)
- EPL models for complementary and substitute items under imperfect production process with promotional cost and selling price dependent demands (Q522375) (← links)
- Economic lot sizing for unreliable production system with shortages (Q1639502) (← links)
- An EMQ model with price and time dependent demand under the effect of reliability and inflation (Q1644555) (← links)
- Multi-item imperfect production inventory model in bi-fuzzy environments (Q1684335) (← links)
- A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering (Q1708531) (← links)
- An economic production quantity model for defective items with trapezoidal type demand rate (Q1937010) (← links)
- Allocation of redundancies in systems: a general dependency-base framework (Q2150807) (← links)
- Imperfection with inspection policy and variable demand under trade-credit: a deteriorating inventory model (Q2178957) (← links)
- Joint determination of optimal safety stocks and production policy for an imperfect production system (Q2428922) (← links)
- Three-layer supply chain - A production-inventory model for reworkable items (Q2445208) (← links)
- Inventory and pricing decisions for an imperfect production system with quality inspection, rework, and carbon-emissions (Q3388832) (← links)
- A joint inventory model with reliability, carbon emission, and inspection errors in a defective production system (Q3388834) (← links)
- (Q3644414) (← links)
- Joint determination of preventive maintenance and safety stocks in an unreliable production environment (Q4367299) (← links)
- Lost sales reduction and quality improvement with variable lead time and fuzzy costs in an imperfect production system (Q4611484) (← links)
- Maximising profits for an EPQ model with unreliable machine and rework of random defective items (Q5172467) (← links)
- A robust fuzzy approach for constrained multi-product economic production quantity with imperfect items and rework process (Q5207735) (← links)
- An EPL model with reliability-dependent randomly imperfect production system over different uncertain finite time horizons (Q5275207) (← links)