Pages that link to "Item:Q992657"
From MaRDI portal
The following pages link to Robust scheduling and robustness measures for the discrete time/cost trade-off problem (Q992657):
Displaying 29 items.
- A float-path theory and its application to the time-cost tradeoff problem (Q305477) (← links)
- The impact of reserve duties on the robustness of a personnel shift roster: an empirical investigation (Q337610) (← links)
- Resilience analysis for project scheduling with renewable resource constraint and uncertain activity durations (Q747041) (← links)
- Robust optimization models for project scheduling with resource availability cost (Q880580) (← links)
- Using a risk-based approach to project scheduling: a case illustration from semiconductor manufacturing (Q928039) (← links)
- A hybrid simulation-optimization approach for the robust discrete time/cost trade-off problem (Q1636886) (← links)
- An agency perspective for multi-mode project scheduling with time/cost trade-offs (Q1722976) (← links)
- Search algorithms for improving the Pareto front in a timetabling problem with a solution network-based robustness measure (Q1730745) (← links)
- Employee substitutability as a tool to improve the robustness in personnel scheduling (Q2014585) (← links)
- A robust optimization approach for the multi-mode resource-constrained project scheduling problem (Q2030698) (← links)
- A fuzzy robustness measure for the scheduling of commissioned product development projects (Q2036560) (← links)
- A reduction tree approach for the discrete time/cost trade-off problem (Q2147020) (← links)
- Generating a robust baseline schedule for the robust discrete time/resource trade-off problem under work content uncertainty (Q2147061) (← links)
- Multimode time-cost-robustness trade-off project scheduling problem under uncertainty (Q2156293) (← links)
- Determination of early warning time window for bottleneck resource buffer (Q2241213) (← links)
- Resource allocation for robust project scheduling (Q2250878) (← links)
- Recent advances in robust optimization: an overview (Q2256312) (← links)
- Maximizing the number of jobs scheduled at their baseline starting times in case of machine failures (Q2305019) (← links)
- Proactive heuristic procedures for robust project scheduling: An experimental analysis (Q2482749) (← links)
- Robust local search for solving RCPSP/max with durational uncertainty (Q2887065) (← links)
- A review of studies on robust project scheduling under uncertainty (Q2924450) (← links)
- Min-Max Regret Version of the Linear Time–Cost Tradeoff Problem with Multiple Milestones and Completely Ordered Jobs (Q3455883) (← links)
- Recoverable Robustness in Shunting and Timetabling (Q3649158) (← links)
- Robust Buffer Allocation for Scheduling of a Project with Predefined Milestones (Q4931918) (← links)
- Multi-mode bi-objective proactive project scheduling optimization considering robust cost (Q4996288) (← links)
- Project scheduling cost optimization based on resource transfer costs and robustness (Q6065647) (← links)
- Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty (Q6113306) (← links)
- Tabu search for proactive project scheduling problem with flexible resources (Q6164385) (← links)
- A branch-and-bound algorithm for the proactive resource-constrained project scheduling problem with a robustness maximization objective (Q6568412) (← links)