Pages that link to "Item:Q992661"
From MaRDI portal
The following pages link to MIP-based decomposition strategies for large-scale scheduling problems in multiproduct multistage batch plants: a benchmark scheduling problem of the pharmaceutical industry (Q992661):
Displaying 10 items.
- Operating room scheduling with generalized disjunctive programming (Q342094) (← links)
- Staff assignment with lexicographically ordered acceptance levels (Q1743648) (← links)
- Changeover formulations for discrete-time mixed-integer programming scheduling models (Q1753514) (← links)
- Sensitivity and covariance in stochastic complementarity problems with an application to north American natural gas markets (Q1754301) (← links)
- Flexible job shop scheduling problem for parallel batch processing machine with compatible job families (Q2290149) (← links)
- An efficient MILP-based decomposition strategy for solving large-scale scheduling problems in the shipbuilding industry (Q2302367) (← links)
- A hybrid method for large-scale short-term scheduling of make-and-pack production processes (Q2356282) (← links)
- Bi-objective no-wait multiproduct multistage product scheduling problem with flexible due dates based on MOIDE-MA (Q2669640) (← links)
- Minimizing the total tardiness and the total carbon emissions in the permutation flow shop scheduling problem (Q2669708) (← links)
- A matheuristic for tactical locomotive and driver scheduling for the swiss national railway company SBB Cargo AG (Q6201534) (← links)