Pages that link to "Item:Q1010303"
From MaRDI portal
The following pages link to A novel hybrid algorithm for scheduling steel-making continuous casting production (Q1010303):
Displaying 13 items.
- Models for scheduling charges in continuous casting: application to a Brazilian steel plant (Q276311) (← links)
- A novel Lagrangian relaxation approach for a hybrid flowshop scheduling problem in the steelmaking-continuous casting process (Q299834) (← links)
- A soft-decision based two-layered scheduling approach for uncertain steelmaking-continuous casting process (Q319506) (← links)
- An effective co-evolutionary artificial bee colony algorithm for steelmaking-continuous casting scheduling (Q322540) (← links)
- A novel algorithm to scheduling optimization of melting-casting process in copper alloy strip production (Q1723199) (← links)
- Scheduling continuous casting of aluminum using a multiple objective ant colony optimization metaheuristic (Q1848643) (← links)
- Rescheduling optimization of steelmaking-continuous casting process based on the Lagrangian heuristic algorithm (Q2397581) (← links)
- No-idle parallel-machine scheduling of unit-time jobs with a small number of distinct release dates and deadlines (Q2668758) (← links)
- A best possible algorithm for an online scheduling problem with deteriorating effect in steel box girder section production (Q2691495) (← links)
- A production re-planning based on genetic algorithm for steelmaking-continuous casting (Q2924421) (← links)
- A genetic algorithm for the steel continuous casting with inter-sequence dependent setups and dedicated machines (Q4634331) (← links)
- A HEURISTIC SCHEDULING ALGORITHM FOR STEEL MAKING PROCESS WITH CRANE HANDLING(<Special Issue>Advanced Planning and Scheduling for Supply Chain Management) (Q5423042) (← links)
- Modeling and solving the steelmaking and casting scheduling problem (Q6066683) (← links)