Pages that link to "Item:Q1011913"
From MaRDI portal
The following pages link to Mathematical method for expediting scrap-or-rework decision making in EPQ model with failure in repair (Q1011913):
Displaying 5 items.
- Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments (Q409873) (← links)
- Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns (Q869601) (← links)
- Using algebraic approach to solve an EPQ model with rework and service level constraint (Q3602258) (← links)
- Maximising profits for an EPQ model with unreliable machine and rework of random defective items (Q5172467) (← links)
- Numerical method for determination of reworking or scraping the defective items in a finite production rate model (Q5467003) (← links)