Pages that link to "Item:Q1037662"
From MaRDI portal
The following pages link to Minimum weighted number of tardy jobs on an \(m\)-machine flow-shop with a critical machine (Q1037662):
Displaying 7 items.
- A heuristic method for two-stage hybrid flow shop with dedicated machines (Q339604) (← links)
- Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machines (Q1651647) (← links)
- A hybrid meta-heuristic algorithm to minimize the number of tardy jobs in a dynamic two-machine flow shop problem (Q1686431) (← links)
- Total completion time minimization in a \(2\)-stage differentiation flowshop with fixed sequences per job type (Q1944074) (← links)
- Minimizing the weighted number of tardy jobs on multiple machines: a review (Q2358307) (← links)
- Using a family of critical ratio-based approaches to minimize the number of tardy jobs in the job shop with sequence dependent setup times (Q2378452) (← links)
- (Q4277261) (← links)