Pages that link to "Item:Q1037664"
From MaRDI portal
The following pages link to A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem (Q1037664):
Displaying 48 items.
- An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem (Q296973) (← links)
- An effective branch-and-price algorithm for the preemptive resource constrained project scheduling problem based on minimal interval order enumeration (Q319357) (← links)
- Scheduling resource-constrained projects with a flexible project structure (Q319777) (← links)
- An effective shaking procedure for 2D and 3D strip packing problems (Q336597) (← links)
- Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting (Q337299) (← links)
- Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem (Q415556) (← links)
- Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers (Q421579) (← links)
- Time and work generalised precedence relationships in project scheduling with pre-emption: an application to the management of service centres (Q439612) (← links)
- Multimode preemptive resource investment problem subject to due dates for activities: formulation and solution procedure (Q471724) (← links)
- Multi-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policies (Q526633) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- A double genetic algorithm for the MRCPSP/max (Q709102) (← links)
- Reactive scheduling in the multi-mode RCPSP (Q709110) (← links)
- Railway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environment (Q744657) (← links)
- A priority-rule method for project scheduling with work-content constraints (Q1046055) (← links)
- A genetic algorithm for multi-mode resource constrained project scheduling problem (Q1278080) (← links)
- A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints (Q1628053) (← links)
- A path-relinking algorithm for the multi-mode resource-constrained project scheduling problem (Q1651597) (← links)
- Controllable processing times in project and production management: analysing the trade-off between processing times and the amount of resources (Q1666672) (← links)
- An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode case (Q1681264) (← links)
- An applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resources (Q1698276) (← links)
- An efficient particle swarm optimizer with application to man-day project scheduling problems (Q1718586) (← links)
- Branch and bound algorithms for resource constrained project scheduling problem subject to nonrenewable resources with prescheduled procurement (Q1718808) (← links)
- A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem (Q1752254) (← links)
- A modified PSO algorithm for minimizing the total costs of resources in MRCPSP (Q1954712) (← links)
- Mode-based versus activity-based search for a nonredundant resolution of the multimode resource-constrained project scheduling problem (Q1992769) (← links)
- Discrete and continuous-time formulations for dealing with break periods: preemptive and non-preemptive scheduling (Q1999390) (← links)
- Resource-constrained project scheduling with activity splitting and setup times (Q2003582) (← links)
- A new algorithm for resource-constrained project scheduling with breadth and depth of skills (Q2030541) (← links)
- A robust optimization approach for the multi-mode resource-constrained project scheduling problem (Q2030698) (← links)
- Meta-heuristic solution with considering setup time for multi-skilled project scheduling problem (Q2120134) (← links)
- Considering project management activities for engineering design groups (Q2226486) (← links)
- An updated survey of variants and extensions of the resource-constrained project scheduling problem (Q2242185) (← links)
- An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances (Q2256244) (← links)
- Model and algorithm for human resource-constrained R\&D program scheduling optimization (Q2296461) (← links)
- Schedule generation scheme for solving multi-mode resource availability cost problem by modified particle swarm optimization (Q2356121) (← links)
- Matching formulation of the staff transfer problem: meta-heuristic approaches (Q2656523) (← links)
- Integrated multi-project planning and scheduling -- a multiagent approach (Q2672092) (← links)
- A modified modeling approach and a heuristic procedure for the multi-mode resource constrained project scheduling problem with activity splitting (Q2798120) (← links)
- Fuzzy multi-objective chance-constrained programming model for hazardous materials transportation (Q2817091) (← links)
- Resource-Constrained Scheduling with Non-constant Capacity and Non-regular Activities (Q3133907) (← links)
- Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms (Q4661112) (← links)
- On the choice of baseline schedules for the discrete time/resource trade-off problem under stochastic environment (Q4978242) (← links)
- Solving Multi-Mode Resource-Constrained Multi-Project Scheduling Problem with Combinatorial Auction Mechanisms (Q5143361) (← links)
- A hybrid genetic algorithm and fuzzy set applied to multi-mode resource-constrained project scheduling problem (Q5174108) (← links)
- Multi‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristic (Q6088236) (← links)
- An efficient relax-and-solve method for the multi-mode resource constrained project scheduling problem (Q6588464) (← links)
- Solving a real-life multi-skill resource-constrained multi-project scheduling problem (Q6588468) (← links)