Pages that link to "Item:Q1040983"
From MaRDI portal
The following pages link to An optimization-based heuristic for the robotic cell problem (Q1040983):
Displaying 13 items.
- Optimal \(K\)-unit cycle scheduling of two-cluster tools with residency constraints and general robot moving times (Q282247) (← links)
- Optimizing blocking flow shop scheduling problem with total completion time criterion (Q336393) (← links)
- A scheduling problem in blocking hybrid flow shop robotic cells with multiple robots (Q336565) (← links)
- An optimization-based heuristic for the machine reassignment problem (Q338859) (← links)
- Exact methods for the robotic cell problem (Q656059) (← links)
- Approximation algorithms for \(k\)-unit cyclic solutions in robotic cells (Q706905) (← links)
- Cyclic scheduling of parts and robot moves in \(m\)-machine robotic cells (Q1652519) (← links)
- Incorporating human factors-related performance variation in optimizing a serial system (Q1752770) (← links)
- Exact method for robotic cell problem (Q2861503) (← links)
- Throughput optimization for the Robotic Cell Problem with Controllable Processing Times (Q4603940) (← links)
- A dynamic scheduling algorithm for singe-arm two-cluster tools with flexible processing times (Q5058723) (← links)
- Hybrid Flow Shop Scheduling: Heuristic Solutions and LP-Based Lower Bounds (Q5232862) (← links)
- Scheduling in manufacturing with transportation: classification and solution techniques (Q6586212) (← links)