Pages that link to "Item:Q1202111"
From MaRDI portal
The following pages link to Stochastic project networks. Temporal analysis, scheduling and cost minimization (Q1202111):
Displaying 17 items.
- Scheduling resource-constrained projects with a flexible project structure (Q319777) (← links)
- EOR project networks (Q760101) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- Scheduling of design projects with uncertain number of iterations (Q1124816) (← links)
- A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs (Q1631504) (← links)
- Time complexity of single- and identical parallel-machine scheduling with GERT network precedence constraints (Q1974581) (← links)
- An updated survey of variants and extensions of the resource-constrained project scheduling problem (Q2242185) (← links)
- A simulation approach for evaluation and improvement of organisational planning in collaborative product development projects (Q3055400) (← links)
- Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time (Q3313600) (← links)
- (Q3352823) (← links)
- GERT models in an educational institution (Q3706820) (← links)
- Time complexity of single machine scheduling with stochastic precedence constraints (Q4009793) (← links)
- Algorithms for single-machine scheduling with stochastic outtree precedence relations to minimize expected weighted flow time or maximum expected lateness (Q4300605) (← links)
- First Results on Resource-Constrained Project Scheduling with Model-Endogenous Decision on the Project Structure (Q5171825) (← links)
- (Q5570187) (← links)
- A computational study on bounding the makespan distribution in stochastic project networks (Q5948194) (← links)
- Metaheuristics for the bi-objective resource-constrained project scheduling problem with time-dependent resource costs: an experimental comparison (Q6551095) (← links)