Pages that link to "Item:Q1266705"
From MaRDI portal
The following pages link to A note on an iterative forward/backward scheduling technique with reference to a procedure by Li and Willis (Q1266705):
Displaying 13 items.
- Integration of electromagnetism with multi-objective evolutionary algorithms for RCPSP (Q322615) (← links)
- New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing (Q539456) (← links)
- Experimental investigation of heuristics for resource-constrained project scheduling: an update (Q858327) (← links)
- Activity list representation for a generalization of the resource-constrained project scheduling problem (Q1042097) (← links)
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem (Q1590044) (← links)
- A multicriteria heuristic method to improve resource allocation in multiproject scheduling (Q1590045) (← links)
- New strategies for stochastic resource-constrained project scheduling (Q1617288) (← links)
- Justification and RCPSP: a technique that pays (Q1772841) (← links)
- Bidirectional planning: Improving priority rule-based heuristics for scheduling resource-constrained projects (Q1841162) (← links)
- A hybrid metaheuristic for the resource-constrained project scheduling problem (Q2433434) (← links)
- A hybrid genetic algorithm for the resource-constrained project scheduling problem (Q2455614) (← links)
- A hybrid scatter search/electromagnetism meta-heuristic for project scheduling (Q2570161) (← links)
- An efficient multi-pass heuristic for project scheduling with constrained resources (Q4460052) (← links)