Pages that link to "Item:Q1290158"
From MaRDI portal
The following pages link to A heuristic algorithm for two-machine re-entrant shop scheduling (Q1290158):
Displaying 14 items.
- Minimizing total completion time for re-entrant flow shop scheduling problems (Q650903) (← links)
- On the connection between a cyclic job shop and a reentrant flow shop scheduling problem (Q880555) (← links)
- Heuristic algorithms for two machine re-entrant flow shop (Q930923) (← links)
- Scheduling reentrant jobs on parallel machines with a remote server (Q1010265) (← links)
- Minimizing total tardiness on a two-machine re-entrant flowshop (Q1042154) (← links)
- Heuristics for the two-stage job shop scheduling problem with a bottleneck machine (Q1569925) (← links)
- On scheduling cycle shops: Classification, complexity and approximation (Q1600002) (← links)
- Complexity and approximation of open shop scheduling to minimize the makespan: a review of models and approaches (Q2147068) (← links)
- Minimizing makespan on an \(m\)-machine re-entrant flowshop (Q2459401) (← links)
- Multi-family scheduling in a two-machine reentrant flow shop with setups (Q2467261) (← links)
- Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop (Q5466727) (← links)
- Effective upper and lower bounds for a two-stage reentrant flexible flow shop scheduling problem (Q6164382) (← links)
- Robust scheduling in a two-machine re-entrant flow shop to minimise the value-at-risk of the makespan: branch-and-bound and heuristic algorithms based on Markovian activity networks and phase-type distributions (Q6588502) (← links)
- New efficient algorithms for the two-machine no-wait chain-reentrant shop problem (Q6645175) (← links)