Pages that link to "Item:Q1304380"
From MaRDI portal
The following pages link to Minimizing the number of late jobs under the group technology assumption (Q1304380):
Displaying 7 items.
- Single machine group scheduling with resource dependent setup and processing times (Q707136) (← links)
- Group sequencing around a common due date (Q937402) (← links)
- Group scheduling with controllable setup and processing times: minimizing total weighted completion time (Q1772970) (← links)
- The complexity of two group scheduling problems (Q1860372) (← links)
- A survey of scheduling problems with setup times or costs (Q2467249) (← links)
- A note on the complexity of family scheduling to minimize the number of late jobs (Q5946721) (← links)
- A hybrid heuristic approach to minimize number of tardy jobs in group technology systems (Q6066616) (← links)