Pages that link to "Item:Q1341405"
From MaRDI portal
The following pages link to A bicriterion objective for levelling the schedule of a mixed-model, \(JIT\) assembly process (Q1341405):
Displaying 4 items.
- Simultaneous optimization of classical objectives in JIT scheduling (Q879282) (← links)
- Optimal level schedules in mixed-model, multi-level JIT assembly systems with pegging (Q1278361) (← links)
- (Q3388238) (← links)
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems (Q3818790) (← links)