The following pages link to PSPLIB (Q13492):
Displaying 50 items.
- On the efficient modeling and solution of the multi-mode resource-constrained project scheduling problem with generalized precedence relations (Q280157) (← links)
- A flow-based tabu search algorithm for the RCPSP with transfer times (Q280159) (← links)
- Resource levelling in project scheduling with generalized precedence relationships and variable execution intensities (Q280170) (← links)
- A genetic algorithm for the robust resource leveling problem (Q283265) (← links)
- An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem (Q296973) (← links)
- A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations (Q309061) (← links)
- An integer programming approach to the multimode resource-constrained multiproject scheduling problem (Q310345) (← links)
- An effective branch-and-price algorithm for the preemptive resource constrained project scheduling problem based on minimal interval order enumeration (Q319357) (← links)
- Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming (Q319710) (← links)
- Bi-objective multi-mode project scheduling under risk aversion (Q319785) (← links)
- An approach using SAT solvers for the RCPSP with logical constraints (Q321002) (← links)
- Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars (Q322689) (← links)
- Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project (Q322744) (← links)
- A multi-objective imperialist competitive algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations (Q337079) (← links)
- Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting (Q337299) (← links)
- Determining the timing of project control points using a facility location model and simulation (Q337592) (← links)
- A filter-and-fan approach with adaptive neighborhood switching for resource-constrained project scheduling (Q342339) (← links)
- A preemptive bound for the resource constrained project scheduling problem (Q398922) (← links)
- Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem (Q415556) (← links)
- A \((\mu ,\, \lambda )\)-coordination mechanism for agent-based multi-project scheduling (Q421082) (← links)
- Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers (Q421579) (← links)
- An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem (Q433107) (← links)
- Project scheduling with flexible resources: formulation and inequalities (Q443821) (← links)
- A min-flow algorithm for minimal critical set detection in resource constrained project scheduling (Q456733) (← links)
- An iterated local search algorithm for a place scheduling problem (Q474475) (← links)
- Branch-and-price approach for the multi-skill project scheduling problem (Q479223) (← links)
- Using dual presolving reductions to reformulate cumulative constraints (Q487651) (← links)
- Multi-project scheduling with two-stage decomposition (Q490148) (← links)
- A fuzzy time-dependent project scheduling problem (Q497277) (← links)
- Multi-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policies (Q526633) (← links)
- Project scheduling heuristics-based standard PSO for task-resource assignment in heterogeneous grid (Q535971) (← links)
- New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing (Q539456) (← links)
- Applying local rescheduling in response to schedule disruptions (Q613784) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- New concepts for activity float in resource-constrained project management (Q622136) (← links)
- A heuristic approach for resource constrained project scheduling with uncertain activity durations (Q632677) (← links)
- Criticality analysis of activity networks under interval uncertainty (Q633555) (← links)
- Dismantling of nuclear power plants at optimal NPV (Q646667) (← links)
- Time slack-based techniques for robust project scheduling subject to resource uncertainty (Q646671) (← links)
- Explaining the \texttt{cumulative} propagator (Q647477) (← links)
- Tri-directional scheduling scheme: theory and computation (Q655202) (← links)
- A population-based approach to the resource-constrained project scheduling problem (Q702733) (← links)
- Event-based MILP models for resource-constrained project scheduling problems (Q709100) (← links)
- A neurogenetic approach for the resource-constrained project scheduling problem (Q709106) (← links)
- Reactive scheduling in the multi-mode RCPSP (Q709110) (← links)
- Time-constrained project scheduling with adjacent resources (Q709144) (← links)
- A path enumeration approach for the analysis of critical activities in fuzzy networks (Q713412) (← links)
- Efficient priority rules for the stochastic resource-constrained project scheduling problem (Q724000) (← links)
- Maximising the weighted number of activity execution modes in project planning (Q724006) (← links)
- A new approach for quantitative risk analysis (Q744631) (← links)