Pages that link to "Item:Q1374467"
From MaRDI portal
The following pages link to Network scheduling techniques for construction project management (Q1374467):
Displaying 4 items.
- Network construction problems with due dates (Q319443) (← links)
- An influence matrix for project expediting (Q911451) (← links)
- Project scheduling with generalized precedence relations: a new method to analyze criticalities and flexibilities (Q2076817) (← links)
- Preprocessing the discrete time-cost tradeoff problem with generalized precedence relations (Q6534414) (← links)