Pages that link to "Item:Q1399591"
From MaRDI portal
The following pages link to Multi-stage newsboy problem: A dynamic model. (Q1399591):
Displaying 13 items.
- Multi-product newsboy problem with limited capacity and outsourcing (Q1038384) (← links)
- The newsboy problem when customer demand is a compound renewal process (Q1043342) (← links)
- The newsboy problem under progressive multiple discounts (Q1127182) (← links)
- Quality and inventory issues within the newsboy problem (Q1186918) (← links)
- The newsstand problem: A capacitated multiple-product single-period inventory problem (Q1278268) (← links)
- Safety times for multistage assembly system (Q1721490) (← links)
- Scheduling parallel machines by the dynamic newsboy problem (Q1765550) (← links)
- Stochastic Stackelberg equilibria with applications to time-dependent newsvendor models (Q1994259) (← links)
- Dispatch planning using newsvendor dual problems and occupation times: application to hydropower (Q2355074) (← links)
- The multi-period newsboy problem (Q2576256) (← links)
- A semi-analytical solution for a newsboy problem with mid-period replenishment (Q4383677) (← links)
- Effect of the Return Policy in a Continuous-Time Newsvendor Problem (Q4602330) (← links)
- High-dimensional stochastic control models for newsvendor problems and deep learning resolution (Q6589107) (← links)