Pages that link to "Item:Q1400347"
From MaRDI portal
The following pages link to Minimizing flow time in cyclic schedules for identical jobs with acyclic precedence: The bottleneck lower bound. (Q1400347):
Displaying 3 items.
- Performance Measures and Schedules in Periodic Job Shops (Q4367266) (← links)
- Optimal Supervisory Control of Discrete Event Systems: Cyclicity and Interleaving of Tasks (Q5254886) (← links)
- Cyclic scheduling in flow lines: Modeling observations, effective heuristics and a cycle time minimization procedure (Q5688018) (← links)