Pages that link to "Item:Q1412119"
From MaRDI portal
The following pages link to Exact and truncated branch-and-bound procedures for resource-constrained project scheduling with discounted cash flows and general temporal constraints. (Q1412119):
Displaying 9 items.
- Production scheduling in a market-driven foundry: a mathematical programming approach versus a project scheduling metaheuristic algorithm (Q400054) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations (Q1265850) (← links)
- Order-based neighborhoods for project scheduling with nonregular objective functions. (Q1399577) (← links)
- Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints (Q1590046) (← links)
- Generic negotiation mechanisms with side payments -- design, analysis and application for decentralized resource-constrained multi-project scheduling problems (Q1753651) (← links)
- On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints (Q3114719) (← links)
- A Branch and Bound Procedure for the Resource Constrained Project Scheduling Problem with Discounted Cash Flows (Q4363602) (← links)
- Solving time/cost trade-off problems with discounted cash flows using generalized benders decomposition (Q4695780) (← links)