Pages that link to "Item:Q1422056"
From MaRDI portal
The following pages link to Project scheduling. A research handbook. (Q1422056):
Displaying 50 items.
- A flow-based tabu search algorithm for the RCPSP with transfer times (Q280159) (← links)
- A genetic algorithm for the robust resource leveling problem (Q283265) (← links)
- Complexity results for the linear time-cost tradeoff problem with multiple milestones and completely ordered jobs (Q299837) (← links)
- A float-path theory and its application to the time-cost tradeoff problem (Q305477) (← links)
- An integer programming approach to the multimode resource-constrained multiproject scheduling problem (Q310345) (← links)
- A continuous time-cost tradeoff problem with multiple milestones and completely ordered jobs (Q319449) (← links)
- Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming (Q319710) (← links)
- Scheduling resource-constrained projects with a flexible project structure (Q319777) (← links)
- An approach using SAT solvers for the RCPSP with logical constraints (Q321002) (← links)
- Solving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computation (Q336432) (← links)
- Modeling and optimizing the evacuation of hospitals based on the MRCPSP with resource transfers (Q339938) (← links)
- An adaptive crashing policy for stochastic time-cost tradeoff problems (Q342024) (← links)
- Multiobjective project portfolio selection with fuzzy constraints (Q342776) (← links)
- The total adjustment cost problem: applications, models, and solution algorithms (Q398909) (← links)
- A preemptive bound for the resource constrained project scheduling problem (Q398922) (← links)
- Production scheduling in a market-driven foundry: a mathematical programming approach versus a project scheduling metaheuristic algorithm (Q400054) (← links)
- Resource constraint scheduling with a fractional shared resource (Q408404) (← links)
- Resource leveling in a machine environment (Q418090) (← links)
- Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers (Q421579) (← links)
- Heuristics for a project management problem with incompatibility and assignment costs (Q429511) (← links)
- Time and work generalised precedence relationships in project scheduling with pre-emption: an application to the management of service centres (Q439612) (← links)
- An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations (Q439614) (← links)
- Time symmetry of resource constrained project scheduling with general temporal constraints and take-give resources (Q513559) (← links)
- New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing (Q539456) (← links)
- A multi-start evolutionary local search for the two-dimensional loading capacitated vehicle routing problem (Q609809) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- New concepts for activity float in resource-constrained project management (Q622136) (← links)
- Modelling and solving grid resource allocation problem with network resources for workflow applications (Q640301) (← links)
- Dismantling of nuclear power plants at optimal NPV (Q646667) (← links)
- Time slack-based techniques for robust project scheduling subject to resource uncertainty (Q646671) (← links)
- Project scheduling with irregular costs: complexity, approximability, and algorithms (Q707495) (← links)
- Experimental evaluation of simulated annealing algorithms for the time-cost trade-off problem (Q708169) (← links)
- A new lower bound for the resource-constrained project scheduling problem with generalized precedence relations (Q709101) (← links)
- Theoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problems (Q709108) (← links)
- A path enumeration approach for the analysis of critical activities in fuzzy networks (Q713412) (← links)
- Efficient priority rules for the stochastic resource-constrained project scheduling problem (Q724000) (← links)
- Maximising the weighted number of activity execution modes in project planning (Q724006) (← links)
- Preface to the 12th international conference on project management and scheduling (Q744628) (← links)
- A new approach for quantitative risk analysis (Q744631) (← links)
- Simulated annealing for financing cost distribution based project payment scheduling from a joint perspective (Q744648) (← links)
- Railway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environment (Q744657) (← links)
- Discrete-continuous project scheduling with discounted cash inflows and various payment models -- a review of recent results (Q744660) (← links)
- Minimizing the completion time of a project under resource constraints and feeding precedence relations: a Lagrangian relaxation based lower bound (Q766253) (← links)
- A classification of predictive-reactive project scheduling procedures (Q835548) (← links)
- Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities (Q835585) (← links)
- Bi-objective resource-constrained project scheduling with robustness and makespan criteria (Q850236) (← links)
- Experimental investigation of heuristics for resource-constrained project scheduling: an update (Q858327) (← links)
- Mathematical programming and financial objectives for scheduling projects (Q880522) (← links)
- A branch and cut algorithm for resource-constrained project scheduling problem subject to nonrenewable resources with pre-scheduled procurement (Q900590) (← links)
- Robust execution strategies for project scheduling with unreliable resources and stochastic durations (Q906557) (← links)