Pages that link to "Item:Q1422222"
From MaRDI portal
The following pages link to Notes on max flow time minimization with controllable processing times (Q1422222):
Displaying 6 items.
- Pre-emptive scheduling problems with controllable processing times (Q880501) (← links)
- Preemptive scheduling on uniform parallel machines with controllable job processing times (Q930610) (← links)
- A bicriterion approach to preemptive scheduling of parallel machines with controllable job processing times (Q1917233) (← links)
- Optimal allocation and processing time decisions on non-identical parallel CNC machines: \(\epsilon\)-constraint approach (Q2371348) (← links)
- A survey of scheduling with controllable processing times (Q2381529) (← links)
- On Minimizing Flow Time on Processors with Variable Unit Processing Time (Q3755220) (← links)