Pages that link to "Item:Q1577473"
From MaRDI portal
The following pages link to Scheduling on uniform parallel machines to minimize maximum lateness (Q1577473):
Displaying 15 items.
- Hierarchical optimization with double due dates on an unbounded parallel-batching machine to minimize maximum lateness (Q295879) (← links)
- Scheduling identical parallel machines with fixed delivery dates to minimize total tardiness (Q319136) (← links)
- A simulated annealing approach to minimize the maximum lateness on uniform parallel machines (Q552090) (← links)
- Uniform parallel machine scheduling problems with fixed machine cost (Q683926) (← links)
- A note on worst-case performance of heuristics for maintenance scheduling problems (Q868400) (← links)
- Scheduling machine-dependent jobs to minimize lateness on machines with identical speed under availability constraints (Q868990) (← links)
- A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines (Q881563) (← links)
- Non-identical parallel-machine scheduling research with minimizing total weighted completion times: models, relaxations and algorithms (Q965714) (← links)
- A note on generalizing the maximum lateness criterion for scheduling (Q1315993) (← links)
- Scheduling rules to minimize total tardiness in a parallel machine problem with setup and calendar constraints (Q1762106) (← links)
- Makespan minimization on uniform parallel machines with release times (Q1877043) (← links)
- Parallel machine scheduling with the total weighted delivery time performance measure in distributed manufacturing (Q2026991) (← links)
- Scheduling jobs with equal processing times on a single machine: minimizing maximum lateness and makespan (Q2361139) (← links)
- Simulated annealing heuristic for flow shop scheduling problems with unrelated parallel machines (Q2387249) (← links)
- Flexible flow shop scheduling with uniform parallel machines (Q2569085) (← links)