Pages that link to "Item:Q1579499"
From MaRDI portal
The following pages link to Finding the critical path in an activity network with time-switch constraints (Q1579499):
Displaying 8 items.
- A float-path theory and its application to the time-cost tradeoff problem (Q305477) (← links)
- New concepts for activity float in resource-constrained project management (Q622136) (← links)
- The discrete time/cost trade-off problem: Extensions and heuristic procedures (Q835571) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- Critical path in an activity network with time constraints (Q1278077) (← links)
- New computational results for the discrete time/cost trade-off problem with time-switch constraints (Q1772840) (← links)
- A solution approach to find the critical path in a time-constrained activity network (Q2270440) (← links)
- Minimizing task completion time with the execution set method (Q2467305) (← links)