Pages that link to "Item:Q1605061"
From MaRDI portal
The following pages link to A fuzzy project scheduling approach to minimize schedule risk for product development (Q1605061):
Displaying 15 items.
- Developing a heuristic algorithm for order production planning using network models under uncertainty conditions (Q858779) (← links)
- Using a risk-based approach to project scheduling: a case illustration from semiconductor manufacturing (Q928039) (← links)
- New fuzzy models for time-cost trade-off problem (Q975376) (← links)
- A fuzzy robust scheduling approach for product development projects. (Q1410333) (← links)
- Fuzzy finish time modeling for project scheduling (Q1622409) (← links)
- Project scheduling under uncertainty: survey and research potentials (Q1772834) (← links)
- Solving project scheduling problem with the philosophy of fuzzy random programming (Q1927267) (← links)
- A fuzzy robustness measure for the scheduling of commissioned product development projects (Q2036560) (← links)
- Lean holistic fuzzy methodology employing cross-functional worker teams for new product development projects: a real case study from high-tech industry (Q2286890) (← links)
- Developing a mathematical model for scheduling and determining success probability of research projects considering complex-fuzzy networks (Q2336948) (← links)
- Backtracking and exchange of information: Methods to enhance a beam search algorithm for assembly line scheduling (Q2426522) (← links)
- Scheduling interrelated activities in complex projects under high-order rework: a DSM-based approach (Q2668674) (← links)
- A fuzzy set approach to activity scheduling for product development (Q3154442) (← links)
- Determination of fault-tolerant fabric-cutting schedules in a just-in-time apparel manufacturing environment (Q3430238) (← links)
- Evaluation of the quantiles and superquantiles of the makespan in interval valued activity networks (Q6109311) (← links)