Pages that link to "Item:Q1610883"
From MaRDI portal
The following pages link to Project scheduling under time dependent costs -- a branch and bound algorithm (Q1610883):
Displaying 7 items.
- Heuristics for a project management problem with incompatibility and assignment costs (Q429511) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints (Q1628053) (← links)
- An applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resources (Q1698276) (← links)
- A practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lags (Q1736833) (← links)
- Project time-cost analysis under generalised precedence relations (Q1764024) (← links)
- A new approach based on the surrogating method in the project time compression problems (Q2507391) (← links)