Pages that link to "Item:Q1617277"
From MaRDI portal
The following pages link to Single-machine scheduling with workload-dependent tool change durations and equal processing time jobs to minimize total completion time (Q1617277):
Displaying 6 items.
- Scheduling with tool changes to minimize total completion time: Basic results and SPT performance (Q703937) (← links)
- Research on construction and application for the model of multistage job shop scheduling problem (Q782293) (← links)
- An exact algorithm for the preemptive single machine scheduling of equal-length jobs (Q2147002) (← links)
- (Q3517338) (← links)
- Scheduling with tool changes to minimize total completion time: A study of heuristics and their performance (Q4456055) (← links)
- Scheduling with day shifts and breaks (Q6070109) (← links)