Pages that link to "Item:Q1634047"
From MaRDI portal
The following pages link to Integrated production and multiple trips vehicle routing with time windows and uncertain travel times (Q1634047):
Displaying 9 items.
- A robust multi-trip vehicle routing problem of perishable products with intermediate depots and time windows (Q1686418) (← links)
- An uncertain programming for the integrated planning of production and transportation (Q1718332) (← links)
- Solving an integrated scheduling and routing problem with inventory, routing and penalty costs (Q2239995) (← links)
- A multi-trip split-delivery vehicle routing problem with time windows for inventory replenishment under stochastic travel times (Q2358098) (← links)
- The traveling salesman problem with job-times (\textit{TSPJ}) (Q2668643) (← links)
- A hybrid collaborative framework for integrated production scheduling and vehicle routing problem with batch manufacturing and soft time windows (Q6047896) (← links)
- A review on integrated scheduling and outbound vehicle routing problems (Q6168583) (← links)
- Iterated variable neighborhood search for integrated scheduling of additive manufacturing and multi-trip vehicle routing problem (Q6568473) (← links)
- Home chemotherapy delivery: an integrated production scheduling and multi-trip vehicle routing problem (Q6572888) (← links)