Pages that link to "Item:Q1652182"
From MaRDI portal
The following pages link to Minimizing the makespan on a single machine with flexible maintenances and jobs' release dates (Q1652182):
Displaying 9 items.
- Minimizing total completion time on a single machine with a flexible maintenance activity (Q613512) (← links)
- Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance (Q967809) (← links)
- A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem: simulation-based optimization approach (Q1730479) (← links)
- Single-machine scheduling with maintenance activities and rejection (Q2218650) (← links)
- Developing a flexible manufacturing control system considering mixed uncertain predictive maintenance model: a simulation-based optimization approach (Q2241323) (← links)
- Single-machine common due date total earliness/tardiness scheduling with machine unavailability (Q2286433) (← links)
- Equivalence of some different maintenance activities in single-machine scheduling (Q2422132) (← links)
- The parallel AGV scheduling problem with battery constraints: a new formulation and a matheuristic approach (Q6109805) (← links)
- Scheduling identical serial-batching machines in the engine manufacturing supply chain by an integrated variable neighborhood search Algorithm (Q6551161) (← links)