Pages that link to "Item:Q1654372"
From MaRDI portal
The following pages link to Exact methods for the quay crane scheduling problem when tasks are modeled at the single container level (Q1654372):
Displaying 11 items.
- A Benders decomposition-based framework for solving quay crane scheduling problems (Q1622801) (← links)
- The quay crane scheduling problem with non-crossing and safety clearance constraints: an exact solution approach (Q1738835) (← links)
- Modeling and solving rich quay crane scheduling problems (Q1761126) (← links)
- An exact algorithm for the unidirectional quay crane scheduling problem with vessel stability (Q2029972) (← links)
- Optimization for integrated scheduling of intelligent handling equipment with bidirectional flows and limited buffers at automated container terminals (Q2147157) (← links)
- Scheduling quay cranes and shuttle vehicles simultaneously with limited apron buffer capacity (Q6109309) (← links)
- Simultaneous operation of next-generation and traditional quay cranes at container terminals (Q6112695) (← links)
- The synergistic effect of operational research and big data analytics in greening container terminal operations: a review and future directions (Q6113444) (← links)
- Berth and quay crane allocation and scheduling problem with renewable energy uncertainty: a robust exact decomposition (Q6164635) (← links)
- A tree search algorithm for uncertainty-considered consecutive discharging and loading operations between ship and offshore platform (Q6554672) (← links)
- Decomposition algorithms for the robust unidirectional quay crane scheduling problems (Q6568488) (← links)