Pages that link to "Item:Q1681264"
From MaRDI portal
The following pages link to An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode case (Q1681264):
Displaying 13 items.
- Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms (Q990459) (← links)
- A column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharing (Q2027048) (← links)
- An efficient genetic algorithm for decentralized multi-project scheduling with resource transfers (Q2076410) (← links)
- A tree search heuristic for the resource constrained project scheduling problem with transfer times (Q2079399) (← links)
- An updated survey of variants and extensions of the resource-constrained project scheduling problem (Q2242185) (← links)
- A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem (Q2355885) (← links)
- An evolutionary approach for resource constrained project scheduling with uncertain changes (Q2664456) (← links)
- Algorithm for resource-constrained project scheduling problem with resource transfer time (Q4623539) (← links)
- A column-generation-based algorithm for a resource-constrained project scheduling problem with a fractional shared resource (Q5059351) (← links)
- Dynamic resource allocation and collaborative scheduling in R\&D and manufacturing processes of high-end equipment with budget constraint (Q6043112) (← links)
- A branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer times (Q6109310) (← links)
- Design of computational intelligent procedure for thermal analysis of porous fin model (Q6120252) (← links)
- MIP-based solution approaches for multi-site resource-constrained project scheduling (Q6581389) (← links)