Pages that link to "Item:Q1681437"
From MaRDI portal
The following pages link to Profit-maximization generation maintenance scheduling through bi-level programming (Q1681437):
Displaying 4 items.
- Coordination between long-term decision process and day-ahead unit commitment in deregulated markets: a fuzzy hierarchical bi-level modeling approach (Q1667848) (← links)
- A multistage stochastic programming approach for preventive maintenance scheduling of GENCOs with natural gas contract (Q2023991) (← links)
- Modelling generator maintenance scheduling costs in deregulated power markets (Q2629663) (← links)
- A non-cooperative multi-leader one-follower integrated generation maintenance scheduling problem under the risk of generation units' disruption and variation in demands (Q6573323) (← links)