Pages that link to "Item:Q1688445"
From MaRDI portal
The following pages link to Joint production and preventive maintenance scheduling for a single degraded machine by considering machine failures (Q1688445):
Displaying 17 items.
- Integrated production scheduling and maintenance policy for robustness in a single machine (Q337021) (← links)
- An integrated cost model for production scheduling and perfect maintenance (Q553937) (← links)
- A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines (Q892903) (← links)
- Simultaneous scheduling of production and preventive maintenance on a single machine (Q1640459) (← links)
- Integrating preventive maintenance planning and production scheduling under reentrant job shop (Q1993028) (← links)
- A joint optimization model of production scheduling and maintenance based on data driven for a parallel-series production line (Q2052118) (← links)
- Coordinated optimization of production scheduling and maintenance activities with machine reliability deterioration (Q2171074) (← links)
- A hybrid DBH-VNS for high-end equipment production scheduling with machine failures and preventive maintenance activities (Q2222085) (← links)
- Dynamic dispatching and preventive maintenance for parallel machines with dispatching-dependent deterioration (Q2333138) (← links)
- Bi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: application to the permutation flow shop problem (Q2664314) (← links)
- Joint optimization of production scheduling and group preventive maintenance planning in multi-machine systems (Q2675651) (← links)
- Two-machine flow shop scheduling integrated with preventive maintenance planning (Q2795170) (← links)
- Integrated model of single-machine scheduling and maintenance decision for degrading state systems (Q2994160) (← links)
- Integrating production scheduling and preventive maintenance for a single machine with due window (Q3461443) (← links)
- Joint Optimization of Production Plan and Preventive Maintenance Schedule by Stackelberg Game (Q5359052) (← links)
- Integrated production scheduling and preventive maintenance planning for a single machine under a cumulative damage failure process (Q5438259) (← links)
- Optimization of maintenance policy under warranty length-based demand with consideration of both manufacturer and buyer satisfaction (Q6578125) (← links)