Pages that link to "Item:Q1694335"
From MaRDI portal
The following pages link to Optimal workforce assignment to operations of a paced assembly line (Q1694335):
Displaying 18 items.
- Optimal pacing in an assembly-based multi-stage production system (Q1290179) (← links)
- Concurrent operations assignment and sequencing for particular assembly problems in flow lines (Q1357763) (← links)
- Complexity of workforce scheduling in transfer lines (Q1407252) (← links)
- Separate and carousel type allocations of workers in a U-shaped production line (Q1869479) (← links)
- Minimizing the number of workers in a paced mixed-model assembly line (Q1991120) (← links)
- A combinatorial Benders decomposition algorithm for parallel machine scheduling with working-time restrictions (Q2029954) (← links)
- Embedding optimization with deterministic discrete event simulation for assignment of cross-trained operators: an assembly line case study (Q2273660) (← links)
- A graph-based formulation for the shift rostering problem (Q2301967) (← links)
- Synchronous Unpaced Flow Lines with Worker Differences and Overtime Cost (Q3116744) (← links)
- Assembly line team sizing with absenteeism (Q3163105) (← links)
- (Q3806969) (← links)
- Optimal distribution of technological operations on an assembly line (Q4007444) (← links)
- Level workforce planning for multistage transfer lines (Q4632876) (← links)
- An optimal policy for controlling the flow time in an assembly line system (Q4764865) (← links)
- (Q5381993) (← links)
- Cyclic job scheduling in paced assembly lines with cross-trained workers (Q5444459) (← links)
- An improved approximation algorithm for scheduling monotonic moldable tasks (Q6106483) (← links)
- Approximation algorithms for scheduling monotonic moldable tasks on multiple platforms (Q6136082) (← links)