Pages that link to "Item:Q1725820"
From MaRDI portal
The following pages link to Computing strong lower and upper bounds for the integrated multiple-depot vehicle and crew scheduling problem with branch-and-price (Q1725820):
Displaying 4 items.
- Single workgroup scheduling problem with variable processing personnel (Q2173005) (← links)
- A branch and bound algorithm for the multiple depot vehicle scheduling problem (Q3826353) (← links)
- A matheuristic for tactical locomotive and driver scheduling for the swiss national railway company SBB Cargo AG (Q6201534) (← links)
- Multicommodity network flow model of a human resource allocation problem considering time periods (Q6661228) (← links)