Pages that link to "Item:Q1728175"
From MaRDI portal
The following pages link to On the strength of time-indexed formulations for the resource-constrained project scheduling problem (Q1728175):
Displaying 22 items.
- Strong valid inequalities for the resource-constrained scheduling problem with uniform resource requirements (Q924628) (← links)
- Valid inequalities for a time-indexed formulation (Q1785357) (← links)
- Improved formulations and new valid inequalities for a hybrid flow shop problem with time-varying resources and chaining time-lag (Q2108105) (← links)
- Short- and medium-term optimization of underground mine planning using constraint programming (Q2112619) (← links)
- A computational study of constraint programming approaches for resource-constrained project scheduling with autonomous learning effects (Q2117197) (← links)
- The sample analysis machine scheduling problem: definition and comparison of exact solving approaches (Q2146991) (← links)
- A polyhedral study of event-based models for the resource-constrained project scheduling problem (Q2173056) (← links)
- A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints (Q2197158) (← links)
- The multi-mode resource investment problem: a benchmark library and a computational study of lower and upper bounds (Q2215556) (← links)
- Maximizing the expected net present value in a project with uncertain cash flows (Q2239980) (← links)
- Strong bounds for resource constrained project scheduling: preprocessing and cutting planes (Q2333144) (← links)
- A project scheduling problem with periodically aggregated resource-constraints (Q2669745) (← links)
- An MDD-Based Lagrangian Approach to the Multicommodity Pickup-and-Delivery TSP (Q3386761) (← links)
- Polyhedral Results and Branch-and-Cut for the Resource Loading Problem (Q4995060) (← links)
- Optimization Strategies for Resource-Constrained Project Scheduling Problems in Underground Mining (Q5060783) (← links)
- Robust Capacity Planning for Project Management (Q5084614) (← links)
- An iterative time‐bucket refinement algorithm for a high‐resolution resource‐constrained project scheduling problem (Q6066724) (← links)
- Modeling frameworks for the multi‐skill resource‐constrained project scheduling problem: a theoretical and empirical comparison (Q6088125) (← links)
- An improved decision support model for scheduling production in an engineer-to-order manufacturer (Q6097850) (← links)
- Continuous-time formulations for multi-mode project scheduling (Q6164343) (← links)
- Software project scheduling under activity duration uncertainty (Q6588492) (← links)
- A new mathematical model for hybrid flow shop under time-varying resource and exact time-lag constraints (Q6629023) (← links)