Pages that link to "Item:Q1735381"
From MaRDI portal
The following pages link to Effective metaheuristics for scheduling a hybrid flowshop with sequence-dependent setup times (Q1735381):
Displaying 22 items.
- Hybrid flowshop scheduling with machine and resource-dependent processing times (Q534872) (← links)
- Algorithms for a realistic variant of flowshop scheduling (Q732880) (← links)
- An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times (Q850231) (← links)
- Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times (Q958443) (← links)
- Efficient heuristic algorithm for scheduling two-stage hybrid flowshop with sequence-dependent setup times (Q1665637) (← links)
- Reformulation, linearization, and a hybrid iterated local search algorithm for economic lot-sizing and sequencing in hybrid flow shop problems (Q1725606) (← links)
- A hybrid metaheuristic approach for minimizing the total flow time in a flow shop sequence dependent group scheduling problem (Q1736622) (← links)
- Hybrid optimization methods for time-dependent sequencing problems (Q1751901) (← links)
- A Pareto-based adaptive variable neighborhood search for biobjective hybrid flow shop scheduling problem with sequence-dependent setup time (Q1792653) (← links)
- Efficiency of the solution representations for the hybrid flow shop scheduling problem with makespan objective (Q2003565) (← links)
- Logic-based Benders decomposition method for the \textit{seru} scheduling problem with sequence-dependent setup time and DeJong's learning effect (Q2060398) (← links)
- On VNS-GRASP and iterated greedy metaheuristics for solving hybrid flow shop scheduling problem with uniform parallel machines and sequence independent setup time (Q2093903) (← links)
- Optimization for integrated scheduling of intelligent handling equipment with bidirectional flows and limited buffers at automated container terminals (Q2147157) (← links)
- A genetic algorithm for a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times (Q2217032) (← links)
- Metaheuristic algorithms for the hybrid flowshop scheduling problem (Q2273670) (← links)
- A mathematical model and two-stage heuristic for hot rolling scheduling in compact strip production (Q2293881) (← links)
- An improved discrete artificial bee colony algorithm for flexible flowshop scheduling with step deteriorating jobs and sequence-dependent setup times (Q2298888) (← links)
- Iterated greedy algorithms enhanced by hyper-heuristic based learning for hybrid flexible flowshop scheduling problem with sequence dependent setup times: a case study at a manufacturing plant (Q2664430) (← links)
- A parameter-less iterated greedy method for the hybrid flowshop scheduling problem with setup times and due date windows (Q2673560) (← links)
- Modeling and solving the flow-shop scheduling problem with sequence-dependent setup times by firefly algorithm (case study: automotive industry) (Q2676023) (← links)
- Shop scheduling in manufacturing environments: a review (Q6060656) (← links)
- A hybrid fluid master–apprentice evolutionary algorithm for large-scale multiplicity flexible job-shop scheduling with sequence-dependent set-up time (Q6495522) (← links)