Pages that link to "Item:Q1736622"
From MaRDI portal
The following pages link to A hybrid metaheuristic approach for minimizing the total flow time in a flow shop sequence dependent group scheduling problem (Q1736622):
Displaying 5 items.
- The third comprehensive survey on scheduling problems with setup times/costs (Q319774) (← links)
- Total flow time minimization in a flowshop sequence-dependent group scheduling problem (Q733546) (← links)
- A comprehensive review of flowshop group scheduling literature (Q1651625) (← links)
- Minimizing total completion time in the flexible flowshop sequence-dependent group scheduling problem (Q2341222) (← links)
- Genetic algorithms in supply chain management: a critical analysis of the literature (Q2359911) (← links)