Pages that link to "Item:Q1744511"
From MaRDI portal
The following pages link to Capacitated disassembly scheduling under stochastic yield and demand (Q1744511):
Displaying 11 items.
- Disassembly EOQ models with price-sensitive demands (Q821971) (← links)
- Heuristics for solving disassemble-to-order problems with stochastic yields (Q850645) (← links)
- Stochastic program for disassembly lot-sizing under uncertain component refurbishing lead times (Q2160509) (← links)
- Towards circular economy in production planning: challenges and opportunities (Q2189927) (← links)
- Master disassembly scheduling in a remanufacturing system with stochastic routings (Q2358183) (← links)
- Build-pack planning for hard disk drive assembly with approved vendor matrices and stochastic demands (Q2433468) (← links)
- A mixed integer programming formulation for the stochastic lot sizing problem with controllable processing times (Q2668748) (← links)
- Optimum operational schedule and accounts receivable financing in a production supply chain considering hierarchical industrial status and uncertain yield (Q2672139) (← links)
- An Outer Approximation Algorithm for Capacitated Disassembly Scheduling Problem with Parts Commonality and Random Demand (Q3296385) (← links)
- Joint energy capacity and production planning optimization in flow-shop systems (Q6135666) (← links)
- Capacitated disassembly lot-sizing problem with disposal decisions for multiple product types with parts commonality (Q6619776) (← links)