Pages that link to "Item:Q1752859"
From MaRDI portal
The following pages link to An effective heuristic for project scheduling with resource availability cost (Q1752859):
Displaying 10 items.
- An exact algorithm for minimizing resource availability costs in project scheduling (Q976490) (← links)
- Multi-mode resource availability cost problem with recruitment and release dates for resources (Q1634132) (← links)
- The multi-mode resource investment problem: a benchmark library and a computational study of lower and upper bounds (Q2215556) (← links)
- An updated survey of variants and extensions of the resource-constrained project scheduling problem (Q2242185) (← links)
- Schedule generation scheme for solving multi-mode resource availability cost problem by modified particle swarm optimization (Q2356121) (← links)
- Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm (Q2479156) (← links)
- Scatter search for project scheduling with resource availability cost (Q2570160) (← links)
- A simple and effective heuristic for the resource constrained project scheduling problem (Q4679973) (← links)
- A branch-and-bound algorithm for the proactive resource-constrained project scheduling problem with a robustness maximization objective (Q6568412) (← links)
- Resource leveling: complexity of a unit execution time two-processor scheduling variant and related problems (Q6657887) (← links)