Pages that link to "Item:Q1753557"
From MaRDI portal
The following pages link to Anchored reactive and proactive solutions to the CPM-scheduling problem (Q1753557):
Displaying 7 items.
- Reactive and proactive single-machine scheduling to maintain a maximum number of starting times (Q829172) (← links)
- Dominance-based linear formulation for the anchor-robust project scheduling problem (Q2239841) (← links)
- Maximizing the number of jobs scheduled at their baseline starting times in case of machine failures (Q2305019) (← links)
- \(\Gamma\)-robust optimization of project scheduling problems (Q6065662) (← links)
- A two-stage robust approach for minimizing the weighted number of tardy jobs with objective uncertainty (Q6103748) (← links)
- Exact and heuristic methods for Anchor-Robust and Adjustable-Robust RCPSP (Q6581390) (← links)
- Anchor-robust project scheduling with non-availability periods (Q6670507) (← links)