Pages that link to "Item:Q1781550"
From MaRDI portal
The following pages link to Two-machine flowshop scheduling with job class setups to minimize total flowtime (Q1781550):
Displaying 9 items.
- Mixed binary integer programming formulations for the flow shop scheduling problems. A case study: ISD projects scheduling (Q870153) (← links)
- Fuzzy scheduling of job orders in a two-stage flowshop with batch-processing machines (Q962838) (← links)
- A comprehensive review of flowshop group scheduling literature (Q1651625) (← links)
- Minimizing mean flowtime in a two-machine flowshop with sequence-independent setup times (Q1968586) (← links)
- A survey of scheduling problems with setup times or costs (Q2467249) (← links)
- A heuristic approach for two-machine no-wait flowshop scheduling with due dates and class setups (Q2496029) (← links)
- Machine scheduling with job class setup and delivery considerations (Q2655964) (← links)
- Batch-size-based rearrangement of the shop floor into mini-lines (Q2967580) (← links)
- Minimizing flow time on a single machine with job classes and setup times (Q4713573) (← links)