Pages that link to "Item:Q1806754"
From MaRDI portal
The following pages link to The risk of delay of a project in terms of the morphology of its network (Q1806754):
Displaying 11 items.
- A random generator of resource-constrained multi-project network problems (Q964864) (← links)
- An evaluation of the adequacy of project network generators with systematically sampled networks (Q2463502) (← links)
- New summary measures and datasets for the multi-project scheduling problem (Q2670516) (← links)
- Impacts of synergies on software project scheduling (Q2673811) (← links)
- A study of project scheduling based on network morphology and node centralities (Q2824486) (← links)
- A surrogate indicator of criticality for stochastic project networks (Q3156288) (← links)
- The risk model of upstream and downstream project portfolio based on interaction effect and delays (Q4574486) (← links)
- Mapping distinctive competencies: a systemic approach (Q5894905) (← links)
- A review of the contribution of operational research to project management (Q5955087) (← links)
- An empirical project forecasting accuracy framework using project regularity (Q6581383) (← links)
- On the summary measures for the resource-constrained project scheduling problem (Q6581387) (← links)