Pages that link to "Item:Q1810562"
From MaRDI portal
The following pages link to Non-preemptive scheduling to maximize the minimum global inter-completion time (Q1810562):
Displaying 4 items.
- Non-preemptive scheduling with setup times: a PTAS (Q1693204) (← links)
- Non-clairvoyant scheduling for minimizing mean slowdown (Q1884774) (← links)
- On non-preemptive scheduling of recurring tasks using inserted idle times (Q1891163) (← links)
- Scheduling non-preemptible jobs to minimize peak demand (Q2633192) (← links)