Pages that link to "Item:Q1812008"
From MaRDI portal
The following pages link to Progress payments in project scheduling problems. (Q1812008):
Displaying 13 items.
- Discrete-continuous project scheduling with discounted cash inflows and various payment models -- a review of recent results (Q744660) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- Simulated annealing and tabu search for multi-mode project payment scheduling (Q1042041) (← links)
- The impact of solution representations on heuristic net present value optimization in discrete time/cost trade-off project scheduling with multiple cash flow and payment models (Q1634073) (← links)
- Which fuzzy ranking method is best for maximizing fuzzy net present value? (Q1640504) (← links)
- Variable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gap (Q1652132) (← links)
- Capital- and resource-constrained project scheduling with net present value optimization (Q1752257) (← links)
- Multi-mode project payment scheduling problems with bonus-penalty structure (Q2482794) (← links)
- Performance of the heuristic procedures for constrained projects with progress payments (Q4366460) (← links)
- (Q4901420) (← links)
- Maximizing project cash availability (Q5438525) (← links)
- Project Scheduling with Discounted Cash Flows and Progress Payments (Q5690254) (← links)
- A two stage search heuristic for scheduling payments in projects (Q5948201) (← links)