Pages that link to "Item:Q1848632"
From MaRDI portal
The following pages link to A production planning model for an unreliable production facility: case of finite horizon and single demand (Q1848632):
Displaying 4 items.
- Available-to-promise modeling for multi-plant manufacturing characterized by lack of homogeneity in the product: an illustration of a ceramic case (Q727355) (← links)
- Inventory models for imperfect production and inspection processes with various inspection options under one-time and continuous improvement investment (Q1761122) (← links)
- Two-stage production with unreliable machine and finite working hour capacity (Q2748808) (← links)
- Two-stage production plan of probabilistic market demand with unreliable machines and obtainable working hour capacity (Q2780829) (← links)