Pages that link to "Item:Q1850300"
From MaRDI portal
The following pages link to Advanced production scheduling for batch plants in process industries (Q1850300):
Displaying 16 items.
- Value chain management for commodities: a case study from the chemical industry (Q1017958) (← links)
- MILP-based campaign scheduling in a specialty chemicals plant: a case study (Q1017962) (← links)
- The job shop scheduling problem with convex costs (Q1754305) (← links)
- Batch scheduling in process industries: An application of resource-constrained project scheduling (Q1841814) (← links)
- Operational extended model formulations for advanced planning and scheduling systems (Q1991314) (← links)
- A cyclic approach to large-scale short-term planning in chemical batch production (Q2268519) (← links)
- GRASP and path relinking for project scheduling under partially renewable resources (Q2482792) (← links)
- A scatter search algorithm for project scheduling under partially renewable resources (Q2491335) (← links)
- A complex time based construction heuristic for batch scheduling problems in the chemical industry (Q2503084) (← links)
- (Q3416551) (← links)
- An iterated-local-search heuristic for the resource-constrained weighted earliness-tardiness project scheduling problem (Q3605435) (← links)
- Solving Large-Scale Production Scheduling and Planning in the Process Industries (Q4625174) (← links)
- (Q4667080) (← links)
- Scheduling the production of rolling ingots: industrial context, model, and solution method (Q4814095) (← links)
- (Q5282473) (← links)
- Multilevel capacitated lot-sizing and resource-constrained project scheduling: an integrating perspective (Q5712036) (← links)